Step-by-Step Guide

A full Insulslab system is installed in SEVEN clear steps – from site preparation to fully cured slab.

1. Preparation prior to installation

1. Information required for design

2. Preparation of the sub-base

2. Preparation of the sub-base

3. Installation of Insulslab

3. Installation of Insulslab

4. Service penetrations

4. Service penetrations

5. Steel Fibre integration and mixing

5. Steel Fibre integration and mixing

6. Installation and finishing

6. Installation and finishing

7. Curing

7. Curing

 