Step 1 – Information required for design

Prior to starting any Insulslab system installation, certain data is required to inform the engineering process. The developer/contractor should ensure that the following information is available to all of the relevant parties:

  • The soil investigation report conclusions – specialist geo-technical report essential when completing the slab/raft design
  • Foundation layouts in DWG format
  • Superstructure details and any specific tolerance requirements not addressed in standard system installation
  • Site/level plan
  • Tree and root details (if any)